FACTORY LICENCE | PLAN APPROVAL | INDUSTRIAL COMPLIANCE
Factory Plan Approval in Odisha
BBSR Services provides consultancy support for
preparation and approval of factory plans,
factory building drawings, machinery layouts,
process-flow documentation and related
industrial compliance requirements in Odisha.
We assist manufacturers, entrepreneurs,
industrial investors, MSMEs and existing
factories in planning new factory premises,
extensions, additional machinery and
modifications in accordance with applicable
factory requirements.
What is Factory Plan Approval?
Factory Plan Approval is the process of obtaining
approval for the proposed factory site, factory
building arrangement and associated manufacturing
layout before the premises are used as a factory,
wherever such approval is required under the
applicable factory law and rules.
The factory plan is not merely an architectural
floor plan. It should communicate the relationship
between the factory building, manufacturing
process, machinery, worker movement, material
movement, ventilation, lighting, emergency
exits, passages and other relevant safety
arrangements.
In Odisha, the Directorate of Factories & Boilers
provides services relating to approval of new
factory plans and extension plans.
Factory Plan = Site + Building + Process + Machinery + Safety + Worker Movement
The final drawing requirements depend on the
proposed manufacturing activity, building,
machinery, manpower, power requirement and
applicable statutory requirements.
Factory Plan Approval in Odisha
In Odisha, factory plan approval is associated
with the requirements administered by the
Directorate of Factories & Boilers.
The Odisha Factories Rules require plans and
supporting information for proposed construction,
reconstruction, extension or taking a building or
premises into use as a factory, subject to the
applicable provisions.
The official Odisha framework provides for
submission of a manufacturing-process flow chart
and scaled plans showing the factory site and
immediate surroundings, building plan,
elevations and necessary cross-sections,
natural lighting, ventilation, fire escape,
machinery positions, aisles and passageways.
Applications may also be connected with the
combined application framework for establishment
of industries, where applicable.
01
New Factory Plan
Planning and approval of a proposed new
factory building and manufacturing layout.
02
Extension Plan
Approval support for extension or
modification of an existing factory.
03
Machinery Layout
Positioning of machinery, production
areas, aisles and passages.
04
Process Planning
Manufacturing process flow and related
factory layout planning.
Types of Factory Plan Approval
The requirement and scope of plan approval can
vary according to the nature of the proposed
project and the changes being made to the factory.
01
New Factory Plan Approval
For a new manufacturing unit where a
factory building or premises is proposed
to be constructed or taken into use.
02
Factory Extension Plan Approval
For extension or modification of an
existing factory building or manufacturing
area.
03
Machinery Layout Modification
For changes involving machinery
arrangement, production areas or
manufacturing workflow where approval
requirements are triggered.
04
Additional Production Area
Planning for additional production,
storage, processing or supporting areas.
05
Factory Building Modification
Planning for reconstruction, alteration
or other changes to the factory premises.
06
Process Expansion
Layout planning where manufacturing
processes or production capacity are
expanded.
What Should a Factory Plan Show?
A factory plan should be prepared according to
the applicable rules and the actual manufacturing
process. The drawing should provide a clear
representation of the factory site, buildings,
machinery and worker-safety arrangements.
Site Plan
Factory site and immediate surroundings,
including relevant adjacent structures,
roads, drains and other features.
Building Plan
Floor-wise factory building arrangement
and relevant dimensions.
Elevation
Relevant building elevations for the
proposed factory structure.
Cross Sections
Necessary sections showing important
building and process-related details.
Machinery Position
Position and arrangement of major
machinery and production equipment.
Aisles & Passageways
Worker and material movement routes
within the manufacturing area.
Ventilation
Natural or planned ventilation
arrangements as applicable.
Natural Lighting
Relevant natural-lighting arrangements
in the factory building.
Fire Escape
Means of escape and relevant emergency
movement arrangements.
Factory Site Plan and Immediate Surroundings
The site plan should provide a clear picture of
the factory premises and its relationship with
surrounding structures and access arrangements.
Factory plot and site boundary
Factory building location
Adjacent buildings and structures
Approach road and internal roads
Drains and relevant site features
Entry and exit arrangements
Utility areas
Storage and supporting structures
Relevant surrounding land uses
Factory Machinery Layout Planning
Machinery placement is one of the most important
components of a manufacturing factory plan.
The layout should be developed around the actual
production process and not simply around available
floor space.
The machinery layout should consider material
movement, worker movement, maintenance access,
safety distances, utilities, ventilation,
process sequence and future expansion.
Production Machinery
Main machines involved in the manufacturing
process.
Utility Equipment
Compressors, generators, boilers,
electrical equipment and other utilities
where applicable.
Material Handling
Forklifts, conveyors, cranes or other
handling systems where applicable.
Storage
Raw-material, intermediate and
finished-goods storage areas.
Maintenance Access
Suitable access around equipment for
operation and maintenance.
Worker Movement
Safe movement routes and passageways
between production areas.
For detailed machinery planning, see our
Machinery Planning
service.
Manufacturing Process Flow Chart
A factory plan submission should be supported by
a manufacturing-process flow chart and a brief
description of the process.
The flow chart should explain how raw materials
move through the different manufacturing stages
until the final product is produced.
01
Raw Material
02
Processing
03
Manufacturing
04
Quality Control
05
Finished Product
The actual process flow should be prepared
according to the specific product and
manufacturing technology.
Documents Required for Factory Plan Approval in Odisha
The exact document set depends on the project,
location, factory type and applicable authority.
Typical documents may include the following.
01
Form No. 1 / Applicable Application
Application for permission to construct,
extend or take premises into use as a
factory, as applicable.
02
Factory Drawings
Scaled drawings showing site,
building, machinery and relevant safety
arrangements.
03
Process Flow Chart
Manufacturing process flow and brief
description of the process.
04
Land Documents
Applicable land ownership, lease,
rent or possession documents.
05
Machinery List
Proposed machinery with applicable
power ratings and related details.
06
Manpower Details
Proposed workforce information for
applicable assessment and compliance.
07
Local Authority Documents
Applicable NOC or local-authority
documents depending on the project.
08
Pollution Documents
Applicable consent or supporting
environmental documents.
09
Company / Firm Documents
Incorporation documents, partnership
deed or other entity documents as applicable.
10
Fee Payment Proof
Applicable plan-scrutiny fee payment
details.
Land, Building and Factory Premises Planning
Factory plan preparation should begin with
verification of the proposed site and the
suitability of the premises for the intended
manufacturing activity.
Land Ownership
Verify ownership, lease or other lawful
possession of the proposed factory land.
Industrial Land
Check applicable land-use and industrial
development requirements.
Building Structure
Plan the factory structure according to
the manufacturing activity.
Production Area
Allocate adequate space for production
machinery and process operations.
Storage Area
Provide appropriate raw-material and
finished-product storage.
Worker Facilities
Plan applicable welfare and worker
facilities.
For complete factory drawing and spatial
planning, explore our
Factory Layout Planning
service.
Fire Safety Considerations in Factory Plan
Factory planning should consider emergency
movement, means of escape and other applicable
fire-safety requirements from the design stage.
Emergency Exits
Appropriate means of escape should be
reflected in the factory plan.
Access Routes
Emergency and operational access should
be considered during layout planning.
Fire Equipment
Applicable fire-protection equipment
should be planned according to the
premises and risk.
Hazardous Areas
Areas involving combustible, flammable
or hazardous materials require
process-specific assessment.
Worker Evacuation
Worker movement and emergency evacuation
should be considered.
Fire Authority Requirements
Applicable fire-safety approval should
be evaluated separately where required.
See our
Fire NOC
consultancy for fire-safety approval support.
Pollution Control Requirements and Factory Planning
Manufacturing activities may require environmental
consent depending on the nature and pollution
potential of the proposed activity.
The factory planning process should therefore
consider emissions, effluent, waste, air-pollution
control equipment, wastewater treatment and
waste-storage arrangements where applicable.
Odisha Pollution Control Board states that new
intending industrial and developmental projects
requiring consent must obtain Consent to Establish
under the applicable environmental laws.
Air Emissions
Assess process emissions and applicable
air-pollution control arrangements.
Effluent
Identify wastewater generation and
applicable treatment requirements.
Solid Waste
Plan suitable collection, storage and
disposal arrangements.
Hazardous Waste
Evaluate hazardous waste requirements
where applicable.
Pollution Control Equipment
Allocate suitable space for applicable
environmental-control systems.
Consent to Establish
Evaluate CTE requirements before
establishment of the proposed unit.
Explore our
Pollution CTE & CTO
consultancy.
Electrical Planning for Factory Projects
Factory layouts should also account for electrical
rooms, panels, cable routes, power distribution,
machinery connections and other electrical
infrastructure according to the project.
Connected Load
Assess proposed machinery and electrical
power requirements.
Electrical Panel
Plan suitable locations for electrical
distribution equipment.
Cable Routing
Consider safe and practical cable
routing within the factory.
Earthing
Applicable earthing and electrical-safety
arrangements should be planned.
Machinery Connections
Electrical supply should correspond
with the machinery arrangement.
Backup Power
Generator or other backup arrangements
can be evaluated where applicable.
Explore our
Electrical Licence
consultancy for applicable electrical
compliance requirements.
Factory Building Stability Certificate
Approval of a factory plan does not by itself
replace the requirement for structural stability
documentation where applicable.
Odisha factory rules provide for a certificate
of stability before manufacturing operations are
carried on in buildings that have been constructed,
reconstructed, altered, repaired, extended or
otherwise brought into use as a factory, subject
to the applicable provisions.
Important
The stability certificate should be obtained
from an appropriately qualified competent
person in the prescribed manner before the
relevant manufacturing operation is started.
Factory Plan Approval vs Factory Licence
Factory Plan Approval
Primarily concerns approval of the
proposed factory site, building
arrangements, manufacturing layout,
machinery positioning and relevant
safety-related design information.
Factory Licence
Concerns registration and licensing
of the factory for carrying on
manufacturing activities according
to the applicable legal requirements.
These are related but distinct compliance
stages. A project may require plan approval
before the premises are used as a factory,
followed by registration/licensing and other
applicable approvals.
Explore our
Factory Licence
service for registration and licensing support.
Other Approvals That May Be Connected With a Factory Project
Factory plan approval is only one component of
an industrial project. Depending on the project,
additional approvals may be required from
different authorities.
Pollution Consent
Consent to Establish and later applicable
environmental permissions.
Fire NOC
Fire-safety approval where applicable.
Building Approval
Applicable building-plan approval from
the competent local or development authority.
Electrical Approval
Electrical installation and licensing
requirements where applicable.
Factory Licence
Registration and licence under the
applicable factory framework.
Labour Compliance
Applicable worker welfare, safety and
employment compliance.
Water / Sewerage
Applicable water supply, drainage and
wastewater arrangements.
Land Use
Applicable land-use and industrial
development permissions.
Boiler Approval
Applicable boiler registration and
inspection requirements.
Industries Requiring Factory Plan Planning
Factory plan preparation can be required across
a wide range of manufacturing industries.
The drawings and technical information should
always be customised to the actual process.
Food Processing
Rice mills, flour mills, spice units,
beverage units, dairy and other food
manufacturing projects.
Pharmaceutical
Pharmaceutical and allied manufacturing
facilities.
Chemical Industry
Chemical manufacturing and processing
facilities.
Plastic Products
Plastic processing, moulding and
product manufacturing units.
Textile Industry
Textile, garment and related
manufacturing units.
Engineering
Fabrication, machining and engineering
manufacturing projects.
Building Materials
Brick, block, concrete products,
tiles and other building-material units.
Furniture
Wooden, modular, metal and other
furniture manufacturing units.
Packaging
Paper, plastic, corrugated and other
packaging manufacturing units.
Metal Products
Steel, aluminium and other metal-product
manufacturing units.
Electrical Products
Electrical equipment and product
manufacturing projects.
Renewable Energy Equipment
Manufacturing units for applicable
renewable-energy components and equipment.
Our Factory Plan Approval Consultancy
BBSR Services can coordinate the documentation
and technical information required for factory
plan preparation and submission.
01
Project Understanding
Understand the proposed manufacturing
activity, premises, products and capacity.
02
Process Assessment
Review the manufacturing process and
production flow.
03
Machinery Planning
Prepare machinery information and
production-area requirements.
04
Layout Coordination
Coordinate site, building and machinery
layout information.
05
Document Preparation
Compile applicable supporting documents
and project information.
06
Application Support
Support submission and clarification
requirements as applicable.
Factory Plan Approval as Part of Industrial Project Planning
Factory plan approval should ideally be considered
during the initial stage of an industrial project,
rather than after construction or machinery
installation has already been completed.
Early planning helps coordinate the factory
building, production flow, machinery,
utilities, storage, worker movement, fire
safety and environmental requirements.
Explore our
Industrial Project Consultancy
service for broader industrial-project planning.
For a detailed technical and financial project
document, see our
Detailed Project Report
service.
Common Mistakes in Factory Plan Preparation
Incomplete Site Plan
Failing to clearly show the site and
relevant immediate surroundings.
Machinery Missing
Providing a building drawing without
clearly identifying machinery positions.
Incorrect Process Flow
Preparing a generic process flow that
does not match the actual manufacturing
activity.
Poor Material Movement
Ignoring movement of raw materials,
finished products and workers.
Missing Safety Arrangements
Not properly considering ventilation,
lighting, emergency exits and
applicable safety arrangements.
Uncoordinated Approvals
Preparing the factory plan without
considering connected building,
pollution, fire or electrical requirements.
PROJECT EXPERIENCE
Factory & Industrial Consultancy Case Studies
Explore our case studies covering factory
planning, manufacturing projects, machinery
planning, industrial compliance, project
reports and related business consultancy.
View Case Studies
Frequently Asked Questions About Factory Plan Approval
What is Factory Plan Approval in Odisha?
Factory Plan Approval concerns the approval
of the proposed factory site, building
arrangement and relevant manufacturing and
safety-related layout information under the
applicable factory framework.
Who approves factory plans in Odisha?
Factory plan approval is administered through
the Directorate of Factories & Boilers
under the applicable factory law and rules.
What drawings are required for factory plan approval?
Depending on the project, drawings may include
the site plan, immediate surroundings,
building plans, elevations, cross-sections,
machinery positions, aisles, passageways,
ventilation, lighting and fire-escape
arrangements.
Is a manufacturing process flow chart required?
Yes. The Odisha factory-plan framework
provides for a manufacturing-process flow
chart supported by a brief description of
the process.
Is factory plan approval the same as a factory licence?
No. Factory plan approval and factory
registration/licensing are related but
distinct compliance stages.
Is factory plan approval required for an extension?
An extension plan may require approval under
the applicable provisions. Odisha separately
provides for approval of extension plans.
Does factory plan approval replace building approval?
No. Factory plan approval should not be treated
as a substitute for other building, land-use,
fire, environmental or local-authority
approvals that may apply to the project.
Is a stability certificate required?
Applicable factory rules provide for a
certificate of stability for relevant
factory buildings before manufacturing
operations are carried on.
Can machinery be shown in the factory drawing?
Yes. Machinery position is an important
component of factory-plan preparation and
should correspond with the actual
manufacturing process and proposed
installation.
Can BBSR Services help prepare factory plans?
BBSR Services can assist with factory-plan
documentation, manufacturing-process
information, machinery planning, layout
coordination and related industrial
compliance consultancy.
Planning a New Factory or Factory Extension?
Share your project location, manufacturing
activity, proposed machinery, manpower,
production capacity and factory premises
details. We can help you structure the factory
plan and related industrial compliance
requirements.
Important Note:
Factory plan approval requirements depend on the
nature of the manufacturing activity, factory
premises, machinery, manpower, power requirement,
location and applicable laws. Factory plan
approval is separate from other permissions such
as building approval, pollution consent, fire
approval, electrical permissions and factory
licensing where applicable. Current requirements,
forms, fees and authority procedures should be
verified at the time of application.